|
Each tank has its own transferring pipe, the total length of which is 1,100 meters. Pipes from jetty to tanks are cleaned with PIGGABLE and nitrogen, enabling the amount of materials more accurate after loading and unloading. Shield pumps are applied so as to prevent leaking. There are 16 loading arms and drumming equipment in the loading area. In addition, there is precise rationing equipment, which could fulfill the demands of small customers. Besides, there is a 100-ton weigh bridge,displaying parameters in a large screen, and dispatching by computers.
|